This construction estimate template sorts every cost line as labor, materials, equipment, disposal or permits, adds a stated contingency and totals it automatically in Excel. It's free in Excel, Word and fillable PDF, with a filled concrete driveway example and the quantity math below.
Free · No signup · Excel, Word and fillable PDF · Labor, materials, equipment and contingency
Each line starts with its cost type (Labor, Materials, Equipment, Disposal, Permit) so you can see the split at a glance. The Excel version adds a contingency percent, sales tax on taxable lines and a deposit.
Free, no signup and no email needed. Rows marked "(example)" are samples to type over. Each file carries a small "Template by InvoiceSonic" footer that you can delete.
Tear-out and replacement of a 600 sq ft, 4-inch concrete driveway in Phoenix. The company and client are made up; the unit costs are typical for this kind of job.
| Item | Qty | Rate | Taxable | Amount |
|---|---|---|---|---|
| Demolition: break out and remove existing driveway | 600 sq ft | $2.50 | N | $1,500.00 |
| Equipment: skid steer rental | 1 day | $375.00 | N | $375.00 |
| Disposal: concrete haul-off and dump fees | 1 lot | $450.00 | N | $450.00 |
| Materials: gravel base, 4 in compacted | 8 ton | $42.00 | N | $336.00 |
| Materials: #4 rebar at 18 in on center | 600 sq ft | $0.65 | N | $390.00 |
| Materials: ready-mix concrete, 4,000 psi | 8 cu yd | $165.00 | N | $1,320.00 |
| Labor: form, place and finish (3-person crew) | 24 hr | $65.00 | N | $1,560.00 |
| Labor: control joints, broom finish and sealer | 600 sq ft | $0.45 | N | $270.00 |
| Permit: city driveway permit | 1 ea | $150.00 | N | $150.00 |
| Subtotal | $6,351.00 | |||
| Contingency (5%) | $317.55 | |||
| Sales tax (none added, see note) | $0.00 | |||
| Total | $6,668.55 | |||
Contingency is 5% of the $6,351.00 subtotal ($317.55). The total works out to about $11.11 per sq ft. No sales tax is added because the contractor pays tax on materials when buying them, which is common for real property work; check your state.
Write your takeoff assumptions in the notes. When the client asks why the number moved, the math is already on the page. Billing a big job in stages? See progress billing.
Hours by trade and rate. Separating labor from materials is what lets a client accept the number instead of questioning it.
Quantities and unit prices, with a note on how long those prices hold. Material movement is the main reason estimates go over.
Rental, delivery and operating costs listed as their own lines rather than buried in labor.
Permits, inspections, dumpsters and haul-off. These are the items most often forgotten and most often argued about.
A stated percentage for the unknowns. Naming it up front is far easier than asking for it later.
Site access, existing conditions, utilities, weather delays. Write down what you've assumed: that's your protection.
Measure from the plans or the site and work out quantities: square feet, cubic yards, tons, linear feet, hours.
Start each description with its type (Labor, Materials, Equipment, Disposal, Permit), then quantity, unit and current unit cost.
Enter your contingency percent in the Excel file, and a sales tax rate only if your state has you charge it.
List what's not included, the payment schedule, and that scope changes are priced as written change orders.
Save as PDF, send it and keep the signed copy with the job file.
Switch the estimate to an invoice with final figures and approved change orders, and track it to paid.
Create an invoiceLabor by trade, materials with quantities, equipment, permits and disposal, a stated contingency, and clear exclusions and assumptions. Itemizing each element is what makes an estimate defensible when the client questions the total.
Take off quantities from the plans, price labor by trade hours rather than a lump sum, get current material prices in writing, add equipment and disposal, then apply a contingency for the unknowns. The most common cause of a blown estimate is unmeasured scope, not underpriced work.
Commonly 5-10% on new work and 10-20% on renovations, where existing conditions are unknown until you open things up. State the percentage on the estimate rather than hiding it in the line items.
Yes. The Excel file on this page calculates each line, the subtotal, the contingency, sales tax on taxable lines, the total and the deposit. It also opens in Google Sheets with the formulas intact.
Only if the scope is fully defined and measured. Otherwise give an estimate, label it as one, and state the point at which you'll come back for approval, commonly 10-15% over.
Contractor estimate template · Roofing estimate template · Estimate template · Construction invoice template · Progress billing · Markup calculator